Projects, that were accomplished in the recent years
1. GTPS-64 MW of electricity and 114 Gcal/h of heat for the oil-titanium deposit "YaregaRuda" Ukhta, 2009.
Power plant consists from eight GTU-8RM, produced by JSC "Saturn - Gas Turbines" and eight utilization steam boiler KGT-20, manufactured by JSC "Energomash (Belgorod)", two power boilers BEM-25, water treatment is 200 t / h with desalination systems. The project is executed and finding was given by the State Expert Committee.
2.
Extension block of Zhanazhol gas turbine power plant
the Republic of Kazakhstan, with capacity of 20 MWe, that consists
from gas turbines and heat recovery of exhaust gases
based on ORC technology,
2012 г.
The project is executed and
affirmative finding was given by the State Expert Committee the Republic of Kazakhstan
.